Before taking handover of a home, buyers face property transactions that often run into tens of millions, and a growing number commission a third-party professional inspection team to check the plumbing and electrical systems, the mechanical and electrical systems, and the civil works of the whole unit (fees commonly vary by indoor floor area in ping (1 ping ≈ 3.3 m²) and unit type, roughly NT$12,000 to NT$22,000). However, some commercial advertising wraps tech inspection instruments up as if they were “X-ray vision” that can do anything. Only by understanding objectively the real physical principles and technical limits of each type of instrument, and by understanding precisely the time limits on legal rights after handover, can a buyer make the right decisions when negotiating inspection defects and pursuing their rights.
Taiwan Tech Home Inspection: Tool Limits and Leak Claims

This article is compiled from publicly available online sources for general reference only; readers should independently verify and judge its accuracy, and it is not legal, tax, medical or engineering advice. Rules, fees and subsidies change; check the latest notice from the responsible authority before acting. For electrical, gas, structural or health risks, consult a qualified professional.
This is the English edition of a Chinese article, adapted with AI assistance and checked against the original. Where the two differ, the Chinese version and the official sources it cites prevail.
I. What can the core tech inspection instruments do, and what are their technical limits?
| Instrument type | Principle and on-site operation | Anomaly clues it can help find in practice | Instrument limits and cautions (do not over-mythologize) |
|---|---|---|---|
| Infrared thermal imager | Senses the infrared radiation energy from a building surface and converts it into an image of surface temperature distribution (the colour palette can be adjusted by the operator, and no single fixed colour means a leak) | Combined with changes in surface temperature difference before and after a window-frame water-spray test or a bathroom water-retention test, it helps identify wall areas that may be damp or water-bearing, or areas of abnormal hot and cold bridging in the building envelope | A thermal imager measures the “surface temperature difference”. It cannot directly measure the height of the waterproofing layer, and it cannot directly see through thick reinforced-concrete structures to deep concealed pipes. After a temperature anomaly is found, it must still be interpreted together with a non-destructive moisture meter, water testing or further inspection |
| Industrial pipe endoscope | A waterproof miniature camera with LED lighting is fed into a floor drain or pipe to view live images of the pipe wall | Helps check whether shallow to mid-length sections of bathroom and balcony drain pipes contain cement mortar lumps or paint chunks left by the construction site, foreign-object blockages, cracked pipe walls or detached joints | The distance and angle that can be inspected are limited by pipe diameter, the number of 90° elbows, the structure of the P-trap / drain trap (U-bend) and the length of the camera cable. It cannot guarantee that every deep concealed pipe and shared riser in the whole building is covered |
| Phase, grounding and leakage test instruments | A three-hole socket polarity tester, a ground resistance tester and an earth-leakage circuit breaker (ELCB, 漏電斷路器) tester are used separately to take measurements | Checks whether the live wire (L) and neutral wire (N) of every socket in the unit are reversed, whether the grounding circuit (G) is truly continuous, and whether the operating current and trip time of the ELCB in wet areas are acceptable | Must be operated separately by trained and qualified personnel following the correct test procedure, and some leakage simulation tests cut power to that circuit instantly, so before testing it must be confirmed that no precision equipment is running on site |
| Laser level, anemometer and water pressure gauge | Measures the drainage slope height difference of bathroom and balcony floors, the actual airflow of exhaust fans, and the static and dynamic water pressure of the water supply system | Checks whether the bathroom shower floor tends to hold standing water, whether the exhaust duct discharges smoothly without having come loose, and whether tap water supply pressure is too low or too high (beyond the pressure reducing valve standard) | Measurement must be done while the community rooftop water tank and booster equipment are supplying water normally. If the building is not yet formally supplied on inspection day or has only temporary construction-site water, some water pressure data is for reference only |
II. Negotiating handover defects: the presale “handover retention payment” and the resale contract are very different
After receiving the formal defect report issued by the inspection team, the buyer’s and seller’s bargaining chips and legal protection depend entirely on the type of sales contract:
- Presale housing purchases (the Ministry of the Interior’s Mandatory and Prohibited Provisions for Standard-Form Presale Housing Sales Contracts apply): Under Article 13 of the current mandatory provisions of the standard-form contract, before the seller notifies the buyer to arrange handover, the seller must complete the works agreed in the contract and obtain the occupancy permit. The buyer has the right to hold back 5% of the total price of land and building from the self-funded portion as a “handover retention payment”, which is released only after both sides complete repairs and reach agreement (the bank loan portion should also be released to the seller only after the conditions for the handover retention payment are met). Note that the use of the retention payment and the acceptance standards must still be handled as the contract provides. For defects that seriously affect living safety or basic function (such as leaks at the exterior wall or bathroom, severely blocked drain pipes, or abnormal earth-leakage protection in the wiring), the buyer should hold firm and require the builder to complete repairs by a deadline and pass re-inspection. If the defects are only cosmetic, such as minor paint scratches or slight tile colour differences, in practice they are often put on a repair and warranty list through negotiation and handover proceeds as contracted, to avoid disputes over delayed handover arising from proportionality arguments. In addition, under the standard-form contract rules, a builder may not unlawfully press the handover retention payment down to a few tens of thousands of dollars (for example, keeping only NT$50,000) in the contract negotiation terms, and if that happens the buyer may claim that the clause is invalid.
- Resale housing purchases (existing-home transactions): Many first-time buyers wrongly assume that buying a resale home also lets them lawfully withhold a 5% handover retention payment, which is a common legal misunderstanding. Resale purchases do not automatically fall under the “statutory 5% handover retention payment” rule of the presale standard-form contract. The payment percentages for each stage of a resale, the release conditions of the price performance-guarantee escrow account, and whether defects found in an inspection are handled by a price reduction or by repair all depend entirely on the terms of the Real Estate Sales Contract signed by buyer and seller. Therefore, before signing and paying the deposit, the buyer should require the agent and the scrivener to put in writing in the special terms of the contract that “before handover the buyer may commission a professional organization to inspect the unit, and if major leaks, sea-sand or radiation issues, or abnormal plumbing and electrical function are found, the handling, the repair deadline and the deduction mechanism for the performance-guarantee escrow account apply”.
III. Found a leak after handover? Understand precisely the Civil Code “warranty against defects” 5-year and 6-month periods
If, a few months or even a year or two after handover and move-in, a leak in a wall or ceiling is discovered during typhoon season, Articles 354 to 365 of Taiwan’s Civil Code set out the “warranty liability for defects in the thing sold”. But buyers must understand precisely the statutory requirements and the two time limits, and must not oversimplify this into “any leak found within 5 years after handover means the seller must compensate unconditionally”:
- The core precondition for a warranty claim, and the strict limits on “as-is handover” exemption clauses (Civil Code Articles 354 and 355):
* The leak defect must have “already existed when the house was delivered (handover)” (for example, the waterproofing layer was already aged and broken before handover, or concealed pipes were already corroded; if the damage comes from the buyer nailing through piping and wiring during their own renovation, improper construction, or new construction work after handover, it is not a defect at the time the seller delivered), and the buyer must not have known the defect existed when signing the sales contract.
* The “as-is handover” clause is not an all-purpose shield for the seller: although resale contracts often provide “handover as-is, and the buyer agrees to exempt the seller from warranty liability for leak defects”, in judicial practice courts read such exemption clauses very restrictively. In particular, Article 355, paragraph 2 of the Civil Code expressly provides: “A special agreement exempting or limiting the warranty is void if the seller intentionally fails to disclose the defect.” If the buyer can prove that the seller knew before handover that the wall or ceiling was leaking yet deliberately concealed signs of wall efflorescence and peeling (壁癌) and seepage by “repainting, putting up wallpaper, or sealing the wall with wood-work decoration”, the court will find that the seller intentionally failed to disclose the defect and that the exemption clause is void, and the seller still bears full warranty compensation liability. - Two key statutory time limits (Civil Code Articles 356, 359 and 365):
* Duty to inspect promptly and give notice (Civil Code Article 356): After discovering a leak defect, the buyer must inspect promptly and “give notice immediately” to the seller (in practice it is advisable to send a registered letter through the post office together with a LINE text message, to keep clear proof of delivery and timing). If the buyer finds a leak but delays notifying the seller for several months, the law treats the buyer as having approved the thing received, and the buyer will lose the right to a defect warranty.
* The two-part forfeiture period of “5 years after delivery” and “6 months after notice” (Civil Code Article 365): Under Article 365 of the Civil Code, where a buyer may rescind the contract or demand a price reduction because the thing has a defect, the right to rescind or to demand a price reduction is extinguished if it is not exercised within 6 months after the buyer gave notice under Article 356, or once 5 years have passed from delivery of the thing. In other words, the total period for asserting rights can be at most 5 years after handover, and more critically, once a leak is found and the seller is notified, the buyer must formally exercise the price reduction or sue in court “within 6 months”.
* Practical reminder on how to exercise the right: Legally, a “price reduction” is a right of formation. The buyer may assert a price reduction against the seller by a declaration of intent, but to avoid the seller later disputing “whether the declaration of intent to reduce the price was lawfully and clearly exercised within 6 months”, or refusing to refund the money, in practice it is advisable that within 6 months after giving notice of the defect the buyer prepare the leak detection (抓漏) and repair quotation documents, and formally apply for mediation to the township, town or district mediation committee, or file a price reduction or damages suit in the civil court (merely sending a registered letter that only reports the leak without clearly exercising the price reduction or filing suit cannot interrupt the 6-month forfeiture period). - Preserve evidence before starting repairs: After finding a leak following handover, until full photos and video are taken, the seller has been notified to inspect on site, or the necessary third-party professional inspection is completed, do not rush to hire a crew to chip off the wall and redo the waterproofing (防水), covering the scene. Doing so destroys the original evidence of the cause of the leak and makes proof difficult later in negotiation or litigation.
- Distinguish the statutory minimum of a new home’s “builder warranty” from the room for contractual extras: If the home is a presale or new home bought from a builder, besides the Civil Code warranty against defects above, the buyer also enjoys the warranty period agreed in the sales contract. Under the Ministry of the Interior’s Mandatory and Prohibited Provisions for Standard-Form Presale Housing Sales Contracts, the structural parts of the house (such as beams, columns, floor slabs and load-bearing walls) are warranted for 15 years, and fixed building materials and equipment (such as doors and windows, plastering, floor and wall tiles, water supply and drainage piping, and basic waterproofing) are warranted for 1 year. Buyers must recognize that the standard-form contract’s “1 year” is the legally mandated minimum protection (not the maximum). Because defects in a home’s waterproofing work often only surface in typhoon season 1 to 3 years after handover, when signing it is advisable to check proactively whether the builder offers a “waterproofing warranty of 3 to 5 years”, a promise better than the regulation, and to have it written into the contract.
Related reading: Rooftop and Exterior Wall Leak Inspection and Thermography · Taipei Building Facade Tile Inspection and Thermal Scans