This article is compiled from publicly available online sources for general reference only; readers should independently verify and judge its accuracy, and it is not legal, tax, medical or engineering advice. Rules, fees and subsidies change; check the latest notice from the responsible authority before acting. For electrical, gas, structural or health risks, consult a qualified professional.

This is the English edition of a Chinese article, adapted with AI assistance and checked against the original. Where the two differ, the Chinese version and the official sources it cites prevail.

Installing an EV charger in a condominium usually takes two stages. First, get approval inside the community, either the consent of the management committee (管委會) or a resolution of the owners meeting (區分所有權人會議). Then a qualified electrical contractor (電器承裝業) designs and builds it, and you apply to Taipower for power, inspection and energizing. Who has to agree depends on which electricity meter the charger connects to and whether the wiring passes through common areas.

This article is based on the Q&A on installing community EV charging equipment (社區電動車充電設備設置 Q&A, September 2023) from the Energy Administration, Ministry of Economic Affairs, the New Taipei public works department (工務局) guideline on adding EV charging equipment to existing condominiums (既有公寓大廈增設電動車充電設備指引, January 2022), and the Condominium Administration Act on the national laws and regulations database (全國法規資料庫). The Taipower process cites only what the Energy Administration document describes.

Safety warning: Chargers draw a lot of power. Do not run your own wire from behind the meter, do not use public sockets or common-area power, do not break the seal on the meter box or alter the main breaker, and do not hire anyone who is not registered. The Energy Administration document cites Article 59 of the electricity business law (電業法) for the point that customer electrical installation work, including charging equipment, must be handed to a licensed electrical contractor (電器承裝業) to install, build and fit out. If you notice a burning smell, smoke or repeated tripped breakers during the work, stop using it immediately and call a qualified person. If there is a fire, leave first and call 119.

First, work out which situation you are in

The section on management committee or owners meeting approval in the New Taipei public works department guideline lists, by charging method, who must agree and the legal basis:

Charging methodWho must agreeLegal basis (as listed in the guideline)
A. Common parking space, using a common meter, for residents to charge togetherGeneral improvements are part of the management committee's dutiesCondominium Administration Act, Article 36, paragraph 1, item 2
B. Personal-use parking space, using the owner's own meter, for personal chargingWhere piping and wiring must use common areas, the consent of the person responsible for management (管理負責人) or the management committee is requiredArticle 6, paragraph 1, item 4; the guideline also reminds residents on the same switch ahead of the meter about their future power and piping-and-wiring rights
B1. Community installs a shared cable tray so residents' piping and wiring is unifiedWhere piping and wiring must use common areas, the consent of the person responsible for management or the management committee is required (the guideline lists this in the same column as B)Article 6, paragraph 1, item 4
C. Management committee applies to Taipower for a dedicated meter for residents' chargingMajor improvement, decided by a resolution of the owners meetingArticle 11, paragraph 1

The guideline also states one exception: if the owners meeting has already passed a resolution on matters relating to charger installation, the management committee should carry it out in every case (Article 36, paragraph 1, item 1).

Text of the provisions (translated for this article):

  • Article 6, paragraph 1, item 4: "Where maintaining or repairing exclusive portions or portions designated for exclusive use, or installing piping and wiring, requires the use of common areas, this shall be done only after obtaining the consent of the person responsible for management or the management committee."
  • Article 11, paragraph 1: "Demolition, major repair or improvement of common areas and their related facilities shall be carried out according to a resolution of the owners meeting."

The Energy Administration document says: if installing charging equipment in a community counts as major repair, a resolution of the owners meeting is required; if it does not count as major repair, the consent of the management committee is enough.

"Major" or "general": who decides

The Energy Administration document states that whether a repair counts as "major" or "general" is decided according to a resolution of the owners meeting. The New Taipei guideline also recommends writing the standard for major repair or improvement of common areas and related facilities into the community bylaws (規約) to avoid disputes.

Article 19 of the Ministry of the Interior's model condominium bylaws (公寓大廈規約範本; order no. 1030803180 of April 30, 2014) offers default standards that can be ticked: a project amount of NT$100,000 or more, more than 5% of the common fund (公共基金), more than 1 month of management and maintenance costs for the common areas, or another standard. This is only a model; which one your community uses depends on its own bylaws.

Application process (based on the Energy Administration's 2023 document and the New Taipei guideline; for the Taipower steps, the current rules govern)

  1. Check your conditions. Is the parking space private, designated for exclusive use, or common, and where is the meter? The New Taipei guideline notes that when the meters are on each floor, running wiring to a basement parking space is limited by the space in the vertical shaft.
  2. Submit an application to the management committee. The New Taipei guideline includes a self-check form and a flowchart, one for the management committee and one for residents, which you can use as a reference.
  3. Obtain consent according to the table above. Either the management committee consents, or the proposal is put to a resolution of the owners meeting. The community can also amend its bylaws; the New Taipei guideline's example is adding an Article 3-1.
  4. Hire the designer and builder. The Energy Administration document says the user hires an electrical engineer (電機技師) or a legally registered electrical contractor to design and supervise the work in accordance with the Regulations for Installation of Customer Electrical Equipment (用戶用電設備裝置規則), and then applies to Taipower for power.
  5. Apply to Taipower for power and submit the design drawings. Taipower reviews the design drawings and surveys the outside lines at the same time. If the case falls under Article 57 of the Taipower business rules (台電營業規章), the interior wiring design data must be submitted to Taipower and pass its review before work may begin.
  6. Build, complete, inspect. After building according to the drawings, the electrical engineer or contractor responsible for design and supervision submits a completion report. Under Article 32 of the electricity business law (電業法) and Article 3 of the customer electrical equipment inspection rules (用戶用電設備檢驗辦法), power is connected only after Taipower's inspection passes, and periodic inspections follow once the equipment is in operation.

Who applies to Taipower? The Energy Administration document says that when the charging equipment is on the user's side of the meter, the user applies. When the community sets up one dedicated, separately metered account, the person responsible for management or the management committee should handle the power application. For Taipower's contact point and forms, call 1911.

How electricity charges and costs are split

ConnectionElectricity chargeEffect on the community's contract capacity
Behind the user's meterAdded to that household's electricity bill and paid by the userDoes not affect the contract capacity for community common-area power
One dedicated, separately metered account for the communityThe wiring is separate from common-area power, and the electricity charge can be shared by the car owners who have installed charging equipmentDoes not affect the contract capacity for community common-area power
Merged into community common-area powerCounted as common-area powerAffects the contract capacity for common-area power; users or the management committee need to track changes in electricity use and, when appropriate, apply for a contract capacity change under Taipower's business rules

The Energy Administration document (2023) says users of charging equipment can apply to Taipower for time-of-use rates. Rates and line installation fees follow Taipower's current rate schedule, and government subsidies differ from year to year, so this article lists no amounts.

Who pays the construction cost is for the community to decide. The bylaws example in the New Taipei guideline leaves the cost of building cable trays and dedicated meters to be borne by one of two options: the "common fund" (公共基金) or the "residents who need parking spaces" (需求車位住戶).

Construction and insurance notes

  • Construction notes in the New Taipei guideline: the basement should have a clear height of at least 2.1 meters and must not obstruct reasonable passage to other parking spaces. In principle, drilling through floor slabs, beams or columns is not advisable. Where the drilled opening in a floor slab reaches 8 inches × 8 inches or more, or an opening or hole is made in a beam, you must first apply to the public works department for review and permission. Existing fire-safety equipment must not be removed, covered, or have its function affected.
  • The Energy Administration document recommends that, during construction, the contractor can take out a comprehensive installation insurance policy. Where the community sets up one dedicated account, the community can add public liability insurance.

Does the Act have a provision specifically for charging equipment?

The Condominium Administration Act as checked for this article on the national laws and regulations database (most recent amendment May 11, 2022) has no provision aimed specifically at charging equipment. The approaches above apply the existing Articles 6, 10, 11 and 36. The New Taipei guideline (January 2022) mentions that the construction and planning agency (營建署) was then studying adjustments to the Act. This article has not confirmed whether it was later amended, so rely on the current text.

Related reading: for distribution capacity and upgrades, see upgrading an old apartment's electrical panel to 220V and applying to Taipower and whether a 30A panel is enough in an old apartment. For community-side energy management, see community building EV chargers and EMS capacity and assessing EV charger installation in an old apartment. When asking contractors for quotes, you can first use the repair quotation generator to organize the parking space location, meter location and your requirements.

FAQ

My parking space is privately owned. Do I still need the management committee's consent?

The Energy Administration document explains that installing charging equipment at a private parking space passes through common areas, so the construction is to be carried out by the person responsible for management or the management committee. The New Taipei guideline's basis is Article 6, paragraph 1, item 4. In practice it depends on whether your wiring route passes through common areas.

What can I do if the management committee or owners meeting does not agree?

This article does not judge individual cases. You can first ask the management committee to explain its reasons, and use the table above to work out which situation applies. Under Article 25 of the Act, owners who number at least one-fifth (1/5) and who together hold at least one-fifth (1/5) of the ownership share can submit a written request to convene an extraordinary meeting. If the dispute continues, you can consult a lawyer or the mediation committee of the district office (區公所).

What if the community's total power capacity is not enough?

The Energy Administration document explains that when Taipower processes a new connection, it considers whether the community's existing power capacity is sufficient. If it is not, the transformer is replaced with a larger one or an additional transformer is installed, which has to be reviewed case by case. A dedicated community account combined with an energy management system can schedule charging times to spread them out and regulate charging power.

Last updated: 2026-10-28

This article was compiled by SOSfix editors from the following public official sources and is for general reference only. It does not constitute legal, electrical or engineering advice. Laws and announcements get amended; for individual cases, rely on the competent authority's latest announcements and the judgment of professionals.