Old House Rewiring and Plumbing Cost: 2026 Estimates, Loans

Old House Rewiring and Plumbing Cost: 2026 Estimates, Loans

This article is compiled from publicly available online sources for general reference only; readers should independently verify and judge its accuracy, and it is not legal, tax, medical or engineering advice. Rules, fees and subsidies change; check the latest notice from the responsible authority before acting. For electrical, gas, structural or health risks, consult a qualified professional.

This is the English edition of a Chinese article, adapted with AI assistance and checked against the original. Where the two differ, the Chinese version and the official sources it cites prevail.

For old apartments and mid-rise buildings with a building age of 25 to 30 years or more, buyers and owners planning a renovation often put the budget first into visible items such as built-in woodwork cabinets, extra-durable wood flooring and high-quality tiles, while overlooking the “basic plumbing and electrical work” hidden inside walls and floor slabs. In fact, the basic plumbing and electrical work of an old house is like the blood vessels and nervous system of the human body. When these buildings were designed, high-power induction cookers, dishwashers, total heat exchangers, instant-heat water dispensers and clothes dryers were not yet common, so the capacity of existing distribution circuits is generally insufficient; some homes more than 30 years old still use thinner-gauge single-core wire, aged and brittle PVC insulation jackets, and two-hole outlets without effective grounding protection. If several appliances are started at the same time on old, fully loaded wiring, conductors can easily overheat and insulation can carbonize, leading to an electrical fire.

In water supply and drainage, the galvanized iron pipes commonly found in early buildings (colloquially called 亞鉛管 in practice, not the stainless steel (white iron) pipe commonly used today) readily develop severe rust, scaling and reduced pipe diameter on the inner wall after two or three decades of tap-water residual chlorine and flow scouring. This not only lowers water pressure and produces red rusty water in the morning, but also always carries the risk of the pipe wall perforating and leaking into the ceiling of the neighbor downstairs. Basic plumbing and electrical work usually accounts for 15% to 25% of the total old-house renovation budget (varying with the scale of demolition and the interior finish grade). Before large-scale woodwork and masonry, you must first have qualified professionals inspect wiring insulation, grounding and the current state of water supply and drainage, and then carefully decide between partial improvement and whole-home renewal. Never seal the walls and finish them without first renewing aging concealed piping and wiring, or when a leak or tripped breaker occurs later you will suffer a double loss, because the new finishes will have to be torn out.

Part 1: Old-House Whole-Home Plumbing and Electrical Rewiring, Reference Estimate Breakdown (Case Assumption: 25-ping (1 ping ≈ 3.3 m²) Condo in Taipei and New Taipei)

The amounts below are the “SOSFix reference estimate range” (not a uniform market standard across Taiwan), assuming an indoor floor area of about 25 ping in Taipei and New Taipei, a layout of three bedrooms, two living areas, two bathrooms and one kitchen, and basic work items with all piping and wiring reconfigured, labor and materials included. Note that this estimate table focuses on the “plumbing and electrical trades” and does not include large-scale demolition of structural walls, masonry base coat and plaster finishing, waterproofing work, tile laying, or restoration of woodwork ceilings, nor sanitary fixtures, light fixtures, high-end switch-plate styles, or purchase of air-conditioner units. The actual total price will still vary with the building's floor level (manual carrying costs and waste-removal trips for walk-ups without an elevator), construction-hour limits set by the community management committee (管委會) (such as only 6 hours of work per day and no work during the lunch break), and the actual piping and wiring detour length.

Work item Construction and material selection notes (actual specifications follow on-site load calculations) Pricing unit Reference estimate range (NT$) Illustrative subtotal for the 25-ping case (NT$)
Post-meter main feeder renewal Select the conductor size according to the Taipower-approved contract capacity, the total load calculation, the total conduit length and the installation method (14 mm² or 22 mm² XLPE (cross-linked polyethylene) insulated cable with thick-wall protective conduit is commonly used, and whether an application to add contract capacity must be filed at the same time is assessed under Taipower's business regulations) Lump sum 18,000 - 35,000 25,000
Distribution board (sub-panel) renewal Replace with a safe enclosure with a high-conductivity pure copper busbar, fitted with a main no-fuse breaker, branch no-fuse breakers (NFB, 無熔絲開關), and earth-leakage circuit breakers (ELCB / RCBO, 漏電斷路器) dedicated to damp areas such as the kitchen, bathroom and balcony, with a clearly labeled circuit directory Set 12,000 - 22,000 16,000
Whole-home outlet and lighting circuit rewiring Lay conductors according to each circuit's purpose, rated current and the current Regulations for Installation of Customer Electrical Equipment (用戶用電設備裝置規則) (commonly 2.0 mm single-core wire or 3.5 mm² / 5.5 mm² stranded wire), with a separate green grounding wire (G); sharing a neutral wire between different circuits is strictly prohibited Circuit 2,800 - 4,200 56,000 (illustrative 16 circuits)
Dedicated circuits for high-power appliances Install dedicated lines with dedicated outlets according to the nameplate specifications and installation manuals of the kitchen IH induction cooker, dishwasher, appliance cabinet, bathroom four-in-one heater/ventilation unit and air-conditioner outdoor unit, ensuring they do not compete for current at full-load operation Circuit 3,500 - 5,500 28,000 (illustrative 6 circuits)
Whole-home hot and cold water supply pipe renewal Use pipe material that meets drinking-water hygiene standards for cold water (such as 南亞 drinking-water-grade thick-wall PVC or stainless steel pipe); hot water pipe generally uses SUS304 or SUS316 stainless steel press-fit pipe (common wall thickness specifications selected per the design), with insulation wrap over the full run to reduce heat loss and pipe-wall condensation Room (bathroom/kitchen) 28,000 - 45,000 85,000 (illustrative 2 bathrooms, 1 kitchen)
Wastewater and drainage pipe rerouting Adjust the floor drain, basin, kitchen sink and washing machine drain lines according to the interior design drawings, keep a reasonable drainage slope (commonly 1/50 to 1/100), and install odor-blocking P-traps / drain traps and vent pipes; run a water-flow test after completion Lump sum 25,000 - 45,000 35,000
Low-voltage and network cabling According to smart-home and home-office needs, install high-speed network cable (such as Cat.6 or Cat.6A) and TV coaxial signal cable, keep a safe distance from the power conduits to avoid electromagnetic interference, and route them centrally to a low-voltage box or an IT equipment cabinet with ventilation and heat dissipation Point 1,500 - 2,500 15,000 (illustrative 8 points)

Hidden on-site costs and structural safety reminders:

  1. Walk-up carrying and waste-removal fees: If the old house is a 4th- or 5th-floor walk-up without an elevator, bagging and hauling away the bricks and gravel produced by chasing and grooving for pipes and wires (this must be entrusted to a qualified waste-removal organization approved by the Environmental Protection Bureau; random dumping is strictly prohibited), plus manually carrying stainless steel pipes and cable reels, usually adds about NT$12,000 to NT$25,000 in carrying and removal costs.
  2. Cutting deep horizontally into structural walls and beams and columns is strictly prohibited: When chasing for pipes in an old house, long horizontal deep cuts in reinforced concrete (RC) load-bearing walls, shear walls or structural beams and columns must be strictly prohibited (to avoid cutting through the rebar cover or even weakening seismic resistance); where necessary, route the pipes through the ceiling cavity or a raised-floor pipe channel instead.

Acceptance and test record points (must be done before masonry sealing of the walls):

  • Water supply pipe pressure test: Before the chases are sealed and plastered smooth, the plumber/electrician (水電師傅) must plug all outlets and use a manual or electric test pump to pressurize the hot and cold water lines. The pressure test must be performed according to the manufacturer's technical specifications for the selected pipe, the system's design working pressure and the construction contract (in practice, residential water supply pipes are commonly tested at about 7 to 10 kgf/cm², with the specific value and holding time, such as 30 to 60 minutes, set by the pipe specification and the contract). Clearly photograph with a phone the pressure gauge reading, the timestamp and the appearance of each fitting joint, and only seal the pipes after confirming there is no seepage at all and no abnormal pressure drop.
  • Electrical circuit insulation and grounding tests: After wiring and panels are installed throughout and before power is formally energized, qualified electrical contractor personnel should perform continuity tests, outlet polarity tests (confirming that live L and neutral N are not reversed), grounding resistance tests and insulation resistance tests (using a high-resistance meter to measure the insulation resistance between conductors and to ground, with the test voltage and pass criteria read according to the circuit rated voltage and regulations) in accordance with the current Regulations for Installation of Customer Electrical Equipment (用戶用電設備裝置規則), and require the contractor to provide a complete written test record sheet to keep as the basis for later maintenance and warranty.

Part 2: Financing an Old-House Renovation, Home Equity Loan vs Bank Renovation Loan vs Ministry of the Interior Repair Subsidy, Compared

Facing old-house plumbing, electrical and basic renovation spending that often runs from several hundred thousand to over a million NT dollars, many owners hesitate between “using cash savings” and “using low-interest financing to keep an emergency reserve”. Before financial planning, you must clarify the statutory thresholds and the true cost of funds of the different financing channels. Note in particular: under the Regulations Governing Interest Subsidies for Housing Repair Loans and Subsidies for Simple Housing Repair Costs (修繕住宅貸款利息及簡易修繕住宅費用補貼辦法), the preferential loan amount of the “housing repair loan interest subsidy” of the National Land Management Agency, Ministry of the Interior is determined by the lending institution after inspection and is capped at NT$800,000 (it is not guaranteed that NT$800,000 will always be approved). There is also a strict review of “household annual income and asset limits”, and a fixed annual application period (usually between July and August, months 7 to 8, subject to the Ministry of the Interior's announcement for that year; applications are not open at all times).

To let owners compare directly how the interest rate and repayment term affect monthly household cash flow, the table below first runs a pure mathematical baseline calculation on the basis of “a principal of NT$1,000,000 in every case, equal principal-and-interest amortization, no grace period, and nominal annual rates that exclude bank origination fees and land-registry establishment fees”, and clearly notes in the remarks column the government subsidy plan's actual NT$800,000 cap and rules (under central bank credit controls and tighter bank lending, the actual interest rates and loan-to-value ratios of home equity loans and personal loans follow each lending bank's credit conditions and the market level at the time):

Loan plan type 2026 reference annual rate range (nominal rate, not a guaranteed rate) Assumed repayment term Estimated monthly payment per NT$1,000,000 borrowed (equal principal-and-interest) Cap, hidden costs and application conditions
Financing on the existing property / home equity loan (房屋增貸) About 2.25% - 2.65% (the actual rate follows the bank's credit assessment and the market level at the time) 20 years NT$5,178 - NT$5,375 Review depends on the proportion of the original mortgage principal already repaid, the appraisal appreciation room of the latest valuation, and the personal income-to-debt ratio; when applying, the land-registry mortgage establishment fee (one-thousandth of the established amount) and the bank origination fee (about NT$3,000 - NT$8,000) must be counted separately
Bank renovation-project unsecured personal loan About 3.20% - 6.80% (the actual rate is set according to personal credit and financial conditions) 7 years NT$13,305 - NT$15,000 No real-estate mortgage is required, and review and disbursement are faster (usually 3 to 7 working days); it is subject to the Financial Supervisory Commission cap that unsecured debt must not exceed 22 times monthly income. Practical reminder: to control the use of funds, some banks require a renovation contract, quotation or invoice, or even “disburse directly to the contractor” rather than into the borrower's account; always confirm the disbursement method with the bank before applying
Ministry of the Interior “housing repair loan interest subsidy” Two fixed tiers by status:
・Category 1 (disadvantaged households): postal savings rate minus 0.533%, currently 1.187%
・Category 2 (general households): postal savings rate plus 0.042%, currently 1.762%
Up to 15 years (including a grace period of up to 3 years) *(Note: the preferential loan amount under this plan is capped at NT$800,000; assuming the full NT$800,000 is approved, 15 years with no grace period at 1.762%, the monthly payment is about NT$5,061)* The application must fall within the application period announced by the Ministry of the Interior for that year (usually July–August, months 7–8) and meet the household members' annual income and movable/immovable property limits; the actual approved amount is decided by the lending financial institution after inspection (not necessarily reaching the NT$800,000 cap), and the funds may only be used for necessary equipment and basic works of the dwelling itself (not for buying movable furniture or appliances)

Financial decision advice: If you have held the property for more than 5 years and it has appraisal appreciation room, a home equity loan, with a repayment term as long as 20 years, has a monthly payment of only about one-third of a renovation personal loan and best balances renovation quality with household cash-flow flexibility. If you just bought a second-hand house with no equity-loan room yet, first check whether you qualify for the Ministry of the Interior repair subsidy, or use a bank renovation-project personal loan to cover a short-term funding gap, and keep an emergency reserve of at least 10% to 15% of the total renovation budget to deal with hidden structural or piping and wiring problems found only after demolition.

Part 3: Key Points for Contract Payments and Warranty Negotiation

  1. Itemized formal quotation (refuse vague lump-sum package quotes): Ask the plumbing and electrical contractor or interior renovation company to issue a formal quotation stating the construction address, the company's unified business number, the material brands and specification models (for example 太平洋 or 華新麗華 cables, 士林 or 國際牌 no-fuse breakers, 南亞 water supply pipes, and so on), estimated quantities, unit prices, and whether the 5% business tax is included. A detailed quotation not only prevents extra budget being added under invented pretexts mid-construction, but is also an important legal document when applying to a bank for a “renovation-project personal loan” or, when selling the house in future, claiming the “improvement-cost deduction” under the Integrated Housing and Land Income Tax (房地合一稅).
  2. Installment payments, final acceptance payment and concealed-work photo records: Never pay more than 50% of the construction fee before work starts. It is recommended to split payments into 3 to 4 installments by progress (for example: 30% at signing and material preparation on site; 40% after whole-home chasing, piping and wiring are complete and have passed the water test and the power test; 20% after panels, light fixtures and sanitary fixtures are installed; and the final 10% after the whole project passes completion acceptance with no problems and the test record sheet is handed over). At the same time, be sure to state in the contract the warranty period for waterproofing and plumbing and electrical work (generally 1 to 2 years in common contracts, with waterproofing negotiable up to 3 years), and require the work crew to photograph a full view of the pipe and wire routing on every wall and floor “after chasing the wall and laying pipes, before sealing the chase with cement” (a tape measure can be placed in the frame for scale), building a dedicated “concealed-work piping and wiring map” to make later picture-hanging drilling or future repair tracing easier and to avoid accidentally drilling into concealed pipes, causing leaks or electric shock.

---