In many older Taiwanese houses aged 20 to 30 years, bathrooms were fitted with heavy masonry tiled bathtubs or fiberglass (FRP) tubs. As residents age, stepping over high tub edges poses serious fall hazards for seniors. Furthermore, long-term standing water behind tub aprons leads to black mold and rot, and cracked underlying waterproofing layers frequently cause shower water to seep into concrete floor slabs, causing severe ceiling leaks and wall efflorescence and peeling (壁癌) in units below. Demolishing an outdated bathtub and converting to a modern walk-in shower with wet-dry separation is one of the highest value home improvements. However, if demolition vibrations crack concealed hot and cold water pipes or if waterproofing is substandard, disastrous structural water leaks will result.
Bathtub Removal and Shower Conversion Waterproofing Guide

This article is compiled from publicly available online sources for general reference only; readers should independently verify and judge its accuracy, and it is not legal, tax, medical or engineering advice. Rules, fees and subsidies change; check the latest notice from the responsible authority before acting. For electrical, gas, structural or health risks, consult a qualified professional.
This is the English edition of a Chinese article, adapted with AI assistance and checked against the original. Where the two differ, the Chinese version and the official sources it cites prevail.
Warning: Before demolishing a bathtub, use pipe locators or thermal imaging cameras to map concealed hot/cold water pipes and vertical drainage risers embedded in the wall! Masonry demolition must use micro-impact chipping hammers. Never use heavy demolition jackhammers, which shatter floor slabs or rupture concealed water pipes, flooding walls with pressurized water.
1. Five Core Stages of Bathtub Demolition and Shower Conversion
- Diamond Saw Score Cutting and Controlled Local Demolition:
- Use an angle grinder with a diamond masonry blade to cut clean straight vibration-damping grooves along tile boundaries above the bathtub (preventing shock waves from cracking adjacent intact wall tiles).
- Use a lightweight rotary hammer to carefully chip away surface tiles, brick support piers, and the cast-iron or FRP tub body, hauling debris away. Chipping must completely expose the sound original structural concrete slab; never apply cement over loose brick rubble.
- Water Pipe Relocation and Drainage Slope Configuration:
- The existing low bathtub faucet rough-in (approx. 50 cm above slab) must be chipped open and raised to standard shower height (approx. 95 to 110 cm above finished floor).
- Install an odor-trap drain fitting. The drain pipe slope must strictly maintain a 1% to 2% downward grade to guarantee high shower water discharge without pooling.
- Embedded Artificial Stone Water Barrier Threshold (Curb Base):
- The crucial first defense line for wet-dry separation! Between wet and dry zones, embed a U-shaped artificial stone threshold bedded in mortar directly onto the structural concrete slab.
- The interior core of the curb must be 100% solid filled with mortar, never hollow. The floor and wall waterproofing membrane must turn up and wrap continuously over the curb top and adjoining side walls, forming an enclosed watertight basin.
- Three Cross-Coats of Polymer Modified Elastic Waterproof Cement:
- Smooth substrate with a 1:3 waterproof cement mortar scratch coat. Form 45-degree coved chamfers (R-corners) at wall-floor junctions and embed crack-resistant fiberglass reinforcement mesh.
- Apply high-penetration water-based primer for coat 1. After drying, apply coats 2 and 3 of high-elasticity waterproof cement crosswise. Waterproofing on shower spray walls must reach from the floor up to 180 cm to over 200 cm (or to the ceiling), with complete floor coating reaching 1.5 to 2.0 mm thickness.
- 48-Hour Deep Water Flood Test (Final Acceptance Standard):
- After the waterproofing membrane fully cures (approx. 2 to 3 days), seal floor drain openings tightly with inflatable test plugs or water stoppers.
- Fill the shower floor with water to a depth of at least 3 to 5 cm and maintain standing water for 48 full hours.
- Inspect the ceiling of the downstairs neighbor by hand and with moisture meters to verify the concrete slab is 100% dry with zero dampness before laying tiles.
2. Shower Door Styles: Straight Sliding vs Corner L-Shaped vs Glass Screen
| Enclosure Style | Space Width Needed | Water Containment | Pros and Cons | Material & Labor Cost (TWD) |
|---|---|---|---|---|
| Straight 3-panel sliding door (Most common) | Wall width 120 - 160 cm | ★★★★★ (100% dry-wet separation) | Wide walkthrough opening, durable hardware | NT$12,000 - NT$18,000 |
| Frameless fixed glass walk-in screen | Depth greater than 140 cm | ★★★☆☆ (Minor splash at corners) | Expansive open aesthetic, trackless, easy to clean | NT$6,500 - NT$10,000 |
| L-shaped corner dual sliding doors | 90×90 cm square corner | ★★★★★ (High containment) | Ideal for compact square bathrooms; corner tracks need upkeep | NT$14,000 - NT$22,000 |
3. Bathtub Demolition Budget and Construction Timeline Table
| Project Stage | Primary Work Scope | Duration | Estimated Cost (TWD) |
|---|---|---|---|
| Demolition and debris hauling | Saw cutting, breaking tub brickwork, bagging debris, manual carry-down | Day 1 | NT$8,000 - NT$14,000 |
| Plumbing rerouting & drainage adjustment | Raising hot/cold pipes, relocating drain, adding odor-trap core | Day 2 | NT$4,500 - NT$8,000 |
| Mortar bed, curb embedding, elastic cement | Smoothing mortar, fiberglass mesh, 3 crosswise elastic coats | Days 3 - 4 | NT$12,000 - NT$18,000 |
| 48-hour standing water flood inspection | Flooding 5 cm depth, downstairs ceiling inspection for zero leaks | Days 5 - 6 | Included in waterproofing |
| Tiling and stone threshold joint grouting | Anti-slip floor tiles, wall tile color matching, nano anti-mildew grout | Day 7 | NT$9,000 - NT$15,000 |
| Tempered glass shower sliding door installation | 8 mm tempered safety glass, 304 stainless steel roller track mounting | Day 8 | NT$12,000 - NT$18,000 |
4. Official Building Waterproofing Codes and Inspection Standards
Residential bathroom drainage and floor slab waterproofing must comply strictly with National Land Management Agency Building Technical Regulations Building Equipment Chapter Articles 29 and 30. For polymer modified elastic cement physical performance standards, consult Ministry of Economic Affairs Bureau of Standards, Metrology and Inspection CNS 14930 Polymer Modified Bituminous and Cementitious Waterproof Coatings and CNS 3763 standards.
Further reading on bathroom waterproofing and sliding door care: Shower Threshold Water Barrier Construction Guide, and Shower Sliding Door Stuck Stainless Roller Wheel Replacement Guide.
5. Frequently Asked Questions FAQ
Q1: Can waterproofing be painted only on the footprint where the bathtub was removed?
Never! That is a fatal error often committed to cut corners. A waterproofing membrane must form a continuous seamless envelope. If new and old waterproofing layers do not overlap generously (overlapping by at least 15 to 30 cm), shower water inevitably penetrates micro-crevices at the joint between old and new coatings, causing severe structural leaks. When removing a tub, waterproof the entire bathroom floor and shower walls!
Q2: If matching tiles for the missing tub wall cannot be found, what should be done?
Tiles from 20 years ago are discontinued. Designers recommend creating an intentional accent wall across the vertical shower area. Installing contrasting dark gray stone-textured tiles, hexagonal mosaics, or wood-grain tiles turns the patch into a luxurious boutique hotel feature wall.
Q3: What floor slope should be maintained so shower water drains without pooling?
The standard floor slope in shower zones should be maintained between 1:100 (1 cm drop per 1 meter run) and 1:50. Plumbers and masons must verify slopes with a spirit level to ensure water flows swiftly toward the floor drain; insufficient or reversed slopes leave standing soapy puddles after every shower.
Q4: Can demolition brick rubble be dumped back into hollow floor depressions?
Strictly prohibited! Sharp edges of demolished tiles and brick fragments will puncture the elastic cement membrane under foot traffic. Furthermore, brick debris contains loose powdery dust that prevents cement mortar from bonding to structural slabs, creating hollow voids and future slab leaks.